Skip to main content

Parliamentary constituency energy-performance profile

W07000086 EPC ratings and energy costs

Understand how homes in W07000086 score, what certificate-estimated energy costs look like and how much improvement the recorded recommendations suggest.

Compare with another area →

Average EPC

C 69

0.5 points above analysed national average

Rated C or above

63.5%

of analysed certificates

Potential uplift

+12

average score points

Properties represented

3K

from 3K certificates

At a glance

What the data says about W07000086

63.5%

rated A–C

6.3%

rated E–G

£1,165

certificate-estimated annual cost

Cost figures are averages of estimates recorded on EPCs at different dates. They are useful for comparing areas, but they are not a forecast of a current household bill.

Average EPC score in W07000086

A92+
2.0%
B81–91
5.5%
C69–80
69
56.0%
D55–68
30.2%
E39–54
5.1%
F21–38
0.8%
G1–20
0.4%

EPC band distribution in W07000086

A
542.0%
B
1485.5%
C
56.0%
1,516
D
30.2%
818
E
1375.1%
F
220.8%
G
120.4%

Certificate-estimated energy costs

Cost TypeW07000086National AvgDifference
Heating£869/yr£782/yr▲ £87
Hot water£202/yr£184/yr▲ £18
Lighting£94/yr£95/yr▼ £1
Total£1,165/yr£1,061/yr▲ £104

These values come from certificate assessments and reflect standardised occupancy assumptions and energy prices used when each EPC was produced. They are not live tariffs.

Property types in the dataset

House
1,95372.1%
Flat
50718.7%
Bungalow
2228.2%
Maisonette
250.9%

Main heating fuel

Mains gas
2,54994.2%
Electric
933.4%
Oil
250.9%
LPG
220.8%
Other
180.7%

Carbon emissions and improvement potential

3 t

current annual CO₂ estimate

1.8 t

potential annual estimate

90 m²

average floor area

When the represented homes were built

Pre-1900
5%
1900–1929
8%
1930–1949
7%
1950–1966
22%
1967–1975
14%
1976–1982
8%
1983–1990
9%
1991–1995
5%
1996–2002
5%
2003–2006
4%
2007–2011
3%
2012+
10%

Average EPC score over time

Average EPC efficiency score by year2024: 69, 2025: 70737170686620242025Efficiency score
2024
69
2025
70

What to do next