Skip to main content

Parliamentary constituency energy-performance profile

Sutton Coldfield EPC ratings and energy costs

Understand how homes in Sutton Coldfield score, what certificate-estimated energy costs look like and how much improvement the recorded recommendations suggest.

Compare with another area →

Average EPC

D 66

2.5 points below analysed national average

Rated C or above

43.7%

of analysed certificates

Potential uplift

+15

average score points

Properties represented

9K

from 10K certificates

At a glance

What the data says about Sutton Coldfield

43.7%

rated A–C

13.0%

rated E–G

£1,293

certificate-estimated annual cost

Cost figures are averages of estimates recorded on EPCs at different dates. They are useful for comparing areas, but they are not a forecast of a current household bill.

Average EPC score in Sutton Coldfield

A92+
0.3%
B81–91
5.6%
C69–80
37.7%
D55–68
66
43.2%
E39–54
11.1%
F21–38
1.6%
G1–20
0.3%

EPC band distribution in Sutton Coldfield

A
330.3%
B
5405.6%
C
37.7%
3,615
D
43.2%
4,142
E
11.1%
1,062
F
1581.6%
G
280.3%

Certificate-estimated energy costs

Cost TypeSutton ColdfieldNational AvgDifference
Heating£982/yr£782/yr▲ £200
Hot water£200/yr£184/yr▲ £16
Lighting£111/yr£95/yr▲ £16
Total£1,293/yr£1,061/yr▲ £232

These values come from certificate assessments and reflect standardised occupancy assumptions and energy prices used when each EPC was produced. They are not live tariffs.

Property types in the dataset

House
5,87461.3%
Flat
2,70228.2%
Bungalow
6386.7%
Maisonette
3643.8%

Main heating fuel

Mains gas
7,76681.5%
Electric
1,71418.0%
Other
390.4%
LPG
80.1%
Oil
60.1%

Carbon emissions and improvement potential

4.2 t

current annual CO₂ estimate

2.4 t

potential annual estimate

98 m²

average floor area

When the represented homes were built

Pre-1900
2%
1900–1929
10%
1930–1949
15%
1950–1966
21%
1967–1975
15%
1976–1982
7%
1983–1990
8%
1991–1995
4%
1996–2002
7%
2003–2006
5%
2007–2011
2%
2012+
4%

Average EPC score over time

Average EPC efficiency score by year2020: 64, 2021: 65, 2022: 66, 2023: 67, 2024: 66706866636120202021202220232024Efficiency score
2020
64
2021
65
2022
66
2023
67
2024
66

What to do next